Warren sealing the posts with epoxy sealer.
Looking aft
All the stanchion posts are in and sealed and cut off. We moved the interior walkways out by the sides of the ribs making everything less cluttered in the bilge. We are going to sand and paint the posts white and then drop the staging to continue planking.
Wednesday, July 9, 2014
Subscribe to:
Posts (Atom)